Monday, September 21, 2020

 40m 4el Yagi - part 5: ERECTING


This is the biggest project at OL7M after the H-frame 4 x 6 el G0KSC system for 10m (link). Started about 10 years ago. Jiri OK1RI designed it in 2012.

This 4 el 40m Yagi project is over thousand hours of work. BIG thanks to Jiri OK1RI for many hours of designing. The result is incredible: designed results are the same as reality! Despite the facts that there were a lot of unknowns. We also have to thanks to Father of Jarda OK1XUB for mechanical designs and all consultations, Pida for climbing and many many other who were participated in this big and long project.


There are some parameters:

Boom length:                    19,05 m / 62,5 ft

Boom weight:                    130 kg - special dural triangle 70x70x70 cm

Longest element:             23 m / 75,46 ft

Elements weight :            190 kg - dural - 14 tubings, biggest diameter 100/5 mm

Tower height:                    36 m / 118 ft - triangle 80x80x80 cm

SWR:                                  less than 1:1,2 (7,000 to 7,200 MHz)

With 5m of coax

All posts about this project are there (link).

        

   
    

Wednesday, September 9, 2020

 How we (did not) run VHF contest 2020





We had got big plans for VHF contest. Some weeks ago we have prepared new ladder based tower with pipes on the top. Jindra OK1NOR made new 6 pieces of 6el DK7ZB. We met on the Koruna hill during the Friday morning and started with new tower. All was fine and we had got new antennas soon in the air.

All HW was connected during Saturday. All looked fine. Quick check of the rain radar and what a surprise. Heavy rain and a lot of lightnings, one by one was going to our direction...

Contest started but we made only strong stations... Something is wrong. We had to switch RIG off because of the heavy rain and a lightnings... New preamp, still the same. After hours of checking we decided to switch RIG off, contest ended faster than began... 



   



Another results of the storm

Going down

Photos from Olda OK1YM:




Tuesday, September 1, 2020

 40m 4el Yagi - part 3: tower + TWR cleaning





Some more work at 40m 4 el yagi. Thanks to Pavel OK1MU, Jarda OK1XUB, Standa OK1CID and others.







Standa OK1CID and Pavel OK1MU

Broken steal holter and defects at aluminium boom